6. Equipment Removal and Reinstallation
This section describes the basic procedures required for the removal and reinstallation of the SD10 unit.
Equipment Removal
Confirm that the aircraft electrical system is fully de-energized and that no power is supplied to the unit.
Using a Torx® TX10 tool, release the four M3 fasteners securing the unit to the instrument panel.
Withdraw the unit straight out of the panel cutout while providing adequate support.
Once clear of the panel, disconnect all electrical interfaces from the rear of the unit, ensuring that connectors and wiring are not subjected to mechanical stress.
Equipment Reinstallation
Examine the unit and all electrical connectors for damage, bent pins, or contamination prior to installation.
With the unit supported, reconnect all required electrical connectors to the rear of the unit.
Position the unit in front of the manufacturer-defined panel cutout and carefully guide it into place, aligning the mounting holes with the installed M3 rivet nuts in the instrument panel.
Using a Torx® TX10 tool, install the four M3 mounting screws and tighten them uniformly. Apply a tightening torque of 0.7 ± 0.1 N·m maximum (dry).
Confirm that the unit is flush with the instrument panel, securely fastened, and correctly oriented.
Perform the applicable post-installation inspection and functional verification in accordance with this manual.
6.1. Figure - SD10 Instrument Panel Mounting Arrangement