1. Installation
1.1. Technical data
1.1.1. Table - technical data
Overall dimensions |
62 × 62 × 64 mm (W × H × D)1 |
Weight |
160g |
Power supply voltage |
8 – 16 V DC |
2Power consumption (typical) |
1.2 W |
2Power consumption (max) |
2 W |
2Current draw (typical) |
0.1 A (at nominal supply voltage 12 V) |
Temperature range |
−20 °C to +60 °C |
Interface |
CAN-BUS |
Programmable flaps positions |
5 (negative flaps support) |
Control |
Mechanical (switch), Remote (Schochman EFIS) |
Indication |
5 Dimmable RGB LEDs |
1 - Overall depth includes the rocker switch and connectors.
2 - Controller only value (without actuator drive). Total device consumption (current draw) depends on the connected actuator.
1.1.2. Table - actuator requirements
Type |
Brushed DC |
Motor voltage |
Select an actuator rated for the aircraft supply voltage at the controller. |
Motor drive |
Bidirectional PWM at 2 kHz |
Motor current regulation |
Approximately 3 A under normal operation |
Motor overcurrent protection |
Firmware stops the motor when it detects at least 3.5 A for 250 ms or 4.5 A for 1 ms. |
Feedback |
Potentiometer |
1.2. Connector
1.2.1. Connector - Description
The connector provides all electrical interfaces required for operation of the flaps controller, including power supply, control inputs, feedback signals, and communication lines.
Mechanical Characteristics
Connector type: DA-15 (15-pin, 2-row D-Sub)
Gender: Male (pins on device)
Mounting: Panel-mounted with integrated screw-lock holes
Locking method: Standard D-Sub jack screws (recommended)
The use of screw-lock fasteners is mandatory in aircraft installations to ensure reliable electrical contact and to prevent accidental disconnection due to vibration.
1.2.2. Figure - Connector - pinout
1.2.3. Table - Connector - pinout
Number |
Label |
Description |
|---|---|---|
1 |
DNC |
Do not connect |
2 |
DNC |
Do not connect |
3 |
GND_S |
Ground for actuator |
4 |
5V |
5V |
5 |
FEED |
Feedback from actuator |
6 |
DNC |
Do not connect |
7 |
CAN_L |
CAN bus LOW |
8 |
CAN_H |
CAN bus HIGH |
9 |
DNC |
Do not connect |
10 |
SER_2 |
Servo actuator 2 |
11 |
SER_1 |
Servo actuator 1 |
12 |
GND |
Ground |
13 |
BAT_S |
Battery secondary |
14 |
BAT_P |
Battery primary |
15 |
GND |
Ground |
1.3. Typical wiring installation
1.3.1. Figure - Schematic of typical installation
The schematic illustrates a typical electrical integration of the Schochman Flaps Controller with a brushed DC flap actuator, aircraft power supply, and CAN-BUS network.
The controller is connected to:
Aircraft power supply
Primary supply (BAT_P)
Secondary supply (BAT_S, if used)
Ground (GND)
CAN-BUS network
CAN_H
CAN_L
Flap actuator
Motor drive outputs (SER_1, SER_2)
Actuator ground (GND_S)
Position feedback (FEED)
5V reference (5V, if required by actuator potentiometer)
The controller drives the actuator from the aircraft power supply using bidirectional PWM. It reads the actuator position via an analog feedback signal (typically potentiometer-based).
Important Notes
The actuator pin naming shown in the schematic (e.g., MOTOR+, MOTOR-, +SENSE, -SENSE, POS-FB) is illustrative only. Actual actuator pin names and wiring configuration may differ depending on the actuator manufacturer and model used.
It is the installer’s responsibility to verify:
Correct feedback wiring and voltage range,
Compliance with actuator electrical limits specified in Section 1.1.2 (Actuator Requirements).
Select wire gauge for the actuator load and the aircraft circuit protection. The firmware trip thresholds describe motor protection behavior.
1.4. Mounting Procedure
The unit is designed for panel mounting using a circular cutout with a diameter of 57.6 mm.
The unit shall be secured to the mounting panel using four M4 screws, which are included in the product package. The screws are used to fasten the unit to the panel through the mounting holes located on the front panel of the unit.
The unit shall be installed into the panel cutout in accordance with the dimensions specified in the applicable mounting drawing (panel cutout). During installation, proper seating of the unit against the panel surface shall be ensured to provide mechanical stability and correct positioning of the unit.
The installation shall ensure:
secure mechanical attachment of the unit,
proper alignment of the unit with respect to the panel,
compatibility with the specified 57.6 mm panel cutout.
1.4.1. Figure - instrument panel cutout and mounting holes
As shown in the installation figure, the minimum required space behind the instrument panel for the flush controller is 49.15 mm, measured from the rear surface of the instrument panel.
This dimension represents the minimum installation depth of the unit only and does not include the additional space required for the electrical connector and cable interface connected to the rear of the unit.
NOTE: Additional clearance shall be provided behind the panel to accommodate the mating connector, cable bend radius, and strain relief as required by the connector manufacturer’s specifications.
Sufficient space behind the panel shall be ensured to prevent mechanical interference, connector damage, or excessive stress on the electrical interface.
1.4.2. Figure - space behind the panel
1.5. Equipment Removal and Reinstallation
Removal
Ensure that the aircraft electrical system is switched OFF and that no electrical power is supplied to the unit.
Using an appropriate tool, loosen and remove the four M4 × 5 mm mounting screws by rotating them counter-clockwise.
Carefully extract the unit from the instrument panel cutout, supporting the unit to prevent unintended movement.
While supporting the unit, disconnect all electrical connectors from the rear of the unit. Avoid applying excessive force to the connectors or associated wiring during removal.
Reinstallation
Inspect the threaded holes in the aluminum mounting part, as well as the connectors and connector pins on the unit, for signs of damage, contamination, or wear.
While supporting the unit, connect all required electrical connectors to the rear of the unit.
Carefully position the unit into the manufacturer-defined panel cutout and align the mounting holes with the threaded holes in the aluminum mounting structure. Do not apply excessive force while positioning the unit.
Install the four M4 × 5 mm mounting screws and tighten them evenly to 2.5 ± 0.3 N·m (dry).
Verify that the unit is securely fastened, properly aligned, and flush with the instrument panel surface.
Complete the post-installation inspection. For controller calibration and the ground functional check, follow Servo flaps in the EFIS Configuration Manual.
1.5.1. Figure - Flaps Controller Instrument Panel Mounting Arrangement